Project Scheduling with Time Windows and Scarce Resources

číslo produktu:106949

rezervuj

Project Scheduling with Time Windows and Scarce Resources

Neumann

Rok vydania: 2003

Vydavateľ: Springer

Kniha je momentálne nedostupná.

V prípade dlhodobého záujmu si urobte REZERVÁCIU a my vám odložíme žiadaný kus.

O knihe:

The book presents the state of the art of deterministic resource-constrained project scheduling with time windows. General temporal constraints (arising from minimum and maximum time lags between project activities) and several different types of limited resources are considered. A large variety of time-based, financial, and resource-based objectives important in practice are studied. A thorough structural analysis of the feasible region of project scheduling problems and a classification and detailed investigation of objective functions are performed, which can be exploited for developing efficient exact and heuristic solution methods. New interesting applications of project scheduling to production and operations management as well as investment projects are discussed in the second edition.

Zaradenie do kategórii:

Podrobnosti o titule (výrobné údaje):

Vydavateľstvo: Springer

Rok vydania: 2003

Vydanie: 2nd ed.

ISBN: 978-3-540-40125-4

(9783540401254)

Väzba: tvrdá